PRACTICAL PROJECT GUIDE
Older houses can have asbestos-cement sheets enclosing the subfloor. If a house is being lifted or transported, those baseboards may need controlled removal before the house movers begin.
START WITH EVIDENCE
A survey or laboratory result should identify which baseboards contain asbestos. PropertyHelp then reviews sheet condition, access below decks or steps, services, neighbouring boundaries and what the house mover needs removed.
A PRACTICAL SEQUENCE
Match the asbestos result to the baseboards and agree the exact removal boundary.
Set dates and access requirements with the owner, house mover and other contractors.
Isolate the area and remove bonded sheets using planned Class B controls.
Clean the area, dispose of asbestos waste lawfully and supply completion records.
AVOID PROGRAMME DELAYS
Hidden sheets, restricted access or unconfirmed materials can stop work. Build survey, removal and any required clearance time into the programme before cranes, trucks and house movers are booked.